Motorcycle Retailer Structured Cabling
The largest motorcycle retail store has undertaken a major upgrade of its network cabling system to significantly enhance operational efficiency and communication capabilities. This comprehensive project involved the installation of 583 nodes using two different cable management systems across two office buildings. In Project Phase 1, 386 nodes were installed with underfloor cable management, while in Project Phase 2, 197 nodes were installed with overhead cable management. The primary objective was to modernize the existing network infrastructure, ensuring robust performance, reliability, and scalability to meet both current and future business demands.
- Structured Cabling
We specialize in delivering comprehensive structured cabling solutions, expertly managing the supply and installation of 187 Voice Nodes, 190 Data Nodes, and 9 Wi-Fi Nodes through underfloor cable management, following the successful installation of 96 Voice Nodes, 97 Data Nodes, and 4 Wi-Fi Nodes using overhead cable management. Throughout the process, we ensure that each node is precisely connected, rigorously tested for optimal functionality, and clearly labeled and tagged, maintaining the highest standards of organization and efficiency within the data center environment.
Component Deliveries
We supply Panduit network cabling products, known for their reliability and performance in structured cabling solutions
- Panduit
Category 6 UTP Cable
Category 6 Patch Cord
Category 6 Information Outlet
48-Ports Patch Panel
24-Ports Patch Panel
1RU Horizontal Cable Managers
Dual Faceplate - Others
Alpeth Copper Cable 50 Pair
LSA-PLUS® Series 2 Disconnection Module
Back Mount Frames
Cross Connect Cable
Blank Plate
Phase 1
Project Implementation
We pull network cables in underflooring and ensure efficient and organized installation throughout the infrastructure.
We label and tag network server switches for easy identification and efficient cable management.
Project Turn Over
We have successfully completed Phase 1 of the project. The new structured cabling system is fully prepared to support the existing workstations, with each cable meticulously tagged and organized within the data center. The newly built infrastructure is now ready to be patched with the upcoming network devices.
Phase 2
Project Implementation
In this phase of the project, the network cables are routed through the ceiling. We terminate, patch, and connect the cables to the existing network devices.
Project Turn Over
Similar to Phase 1, we ensure a streamlined and organized installation throughout the entire infrastructure. However, unlike the earlier phase, this phase includes the patching and connecting of cables to the network devices.
Overall, we have successfully completed the network cabling infrastructure upgrades, consisting of two phases, ensuring reliability and robust performance.